Demolition & Rebuild
In the past we have been contracted to tender to minor demolitions & rebuilds on some subsidence claims. These often include the take out and rebuild of a localised area to an external wall, or even a bay window, to be able to re-align the structure due to movement.
On some rare, more serious occasions, subsidence damage can cause major effects to the stability of a property which in some cases can lead to the necessity of part or complete demolition of selected elevations. ‘HB Jones (MIDLANDS) LIMITED.' has the ability and skill to perform the required procedures with ease and professionalism. Ranging from the consultancy and architecture involved in the planning, to the safe systems of the rebuild project whilst onsite. In relation to this, ‘HB Jones (MIDLANDS) Ltd.' are able to apply the stabilising and rebuilding resources they have to manage and construct these projects to the same standard as any other work undertaken by the company.
HB Jones (MIDLANDS) LIMITED make sure they're directly involved in the whole process from the drawing of the plans, digging out of the foundations to decorating the finished product, ensuring a happy customer on every occasion.
Here is an example of a necessary demolition and rebuild job carried out by our qualified operatives. This wall has already collapsed due to the effects of subsidence and therefore will need to be completely taken down and rebuilt upon newly laid foundations of a better standard than the previous.

Below are a few other examples of our skills in other areas of demolition and rebuild.
latest news
H B Jones ( MIDLANDS ) LIMITED have re-located offices, to a more suitable and modern environment, which is in-keeping with the company's vision of moving forward at all times. Our clients always prefer to work with forward thinking, dynamic companies and H B Jones ( MIDLANDS ) LIMITED look to portray this image to the many customers and clients that we work with. Details of our new premises are on the website
HB Jones (MIDLANDS) LIMITED are currently working through 2 fire damage claims at present. You will shortly be able to see the status of these jobs below or in our gallery section of the website.
High Street, Riddings, Alfreton : The whole property has been affected by fire damage and extensive reinstatement, including complete re-plastering, new staircase, replacement kitchen and bathroom suite plus redecorations and replacement UPVC door and windows throughout.
Wilmott Street, Long Eaton: Another property severely affected by fire. The roof is now completely removed and we are starting to fix the complete new roof shortly. Internal reinstatement of the property will follow, upon completion of the roofing works.
Subsidence & Escape of water
HB Jones (MIDLANDS) LIMITED are continuing to deal with the many Subsidence and Escape of Water claims, that come through on a daily basis from our clients, all over the Midlands region.
Miscellaneous
Carrington Day Nursery, Nottingham: Works are nearing completion, which involve extensive, internal alterations, refurbishment and decorations to this busy children's nursery.
