For the past 12 years HB Jones (MIDLANDS) LIMITED have specialized in responding to subsidence based insurance claims all over the midlands area. The claims are sent via Loss Adjusters, Cunningham Lindsey & Oriel Assured Repairs, who deal with a number of preferred building contractors throughout the country.

The contractor selection process is particularly arduous due to the level of service throughout the claim process.

To be selected to tend to the jobs we have to ensure our workmanship is to the highest level of standards, we do this by attending extra training courses regularly throughout the year, carrying out visits to ongoing jobs by supervisors to make sure all works are up to date, and becoming part of federations and systems which provide the team with the correct skills needed to complete the works professionally.

Our Onsite Team

All our permanent site staff hold CSCS card which validates their expertise in the required skills to competently carry out necessary works. With a commitment to achieving the Investors in People standard, combined with a continual annual training plan, HB Jones (MIDLANDS) LIMITED can ensure that all staff are constantly up to date with the latest training and therefore fully qualified to deliver a high service of workmanship to the customer.

Our Office & Communications Team

Our office & communications team consists of qualified members of staff who have all attended specific training to ensure they are equipped to deal with every aspect of the office environment. The office based staff concentrate mainly on liaising with all contacts for the ongoing jobs; from the policy holder to confirm details and make sure they are aware of all procedures, to the site operatives and supervisors to keep track on works. It is also their responsibility to make sure all data input is correct and up to date, along with arranging work dates, scheduling jobs and general office duties.

The other members of the office & communications team, known as the ‘onsite communication liaisons' spend most of their time visiting ongoing jobs to liaise with both the onsite operatives and the policy holder of the property to assess that the work taking place is to the highest standard possible and report their findings back to the office. They are also the main contacts for their teams of onsite operatives in case of any queries whilst the works are ongoing. This is set up so that every aspect of the ongoing works can be dealt with quickly and efficiently to prevent any discomfort to the policy holder/property owner.

 

 

 

latest news

Current Status

Fire

HB Jones (MIDLANDS) LIMITED are currently working through 4 fire damage claims with more coming through in the pipe work. You can see the status of these jobs below or in our gallery section of the website.

Southey Street: The existing roof has been removed and the new trusses have been constructed. The tiles are do to be fitted over the next couple of weeks along with the conservation windows. The new second floor is currently being laid ready for the new staircase to be installed. On completion of the second floor the new ceilings to the first floor will be fitted and any remaining plastering works will be carried out followed by the decorations.

Bradbury Close: The roof is now complete externally and we are now working on installing new electrical systems including storage heaters. The ceilings are due to be replaced over the new week or so, followed by the kitchen and the decorations.

Sixth Avenue: Works at this property are well under way all damaged surfaces have been stripped, all damaged plumbing works have been removed and a new boiler has been installed along with associated pipe work. The new bathroom suit is due to be fitted over the next few weeks. Plastering works are well under way new ceilings have been fitted and damaged surfaces have been skimmed, A partial re wire to the property has also been carried out.

Parkers Lane: Works are also well under way on this claim also. All damaged surfaces have been replaced or cleaned, new doors have been installed, Decorations are in progress along with second fix joinery items.

Subsidence & Escape of water 

HB Jones (MIDLANDS) LIMITED are also working through the many subsidence and escape of water claims that seem to keep coming through on a daily basis from all over the midlands.

Miscellaneous

Masters & Scholars: Partial demolition works have been carried out to the existing oil tank housing. The new reinforced raft has been excavated and laid, the new housing brickwork has been set out and is currently being constructed.